Navigating telecom licensing can be a complex process, but it’s a crucial step for any business looking to deploy wireless networks, mobile services, or private communications solutions. Whether you’re expanding your operations or setting up a new telecom service, understanding licensing requirements ensures compliance with UK regulations and avoids costly delays. In this blog, we’ll break down the essentials of telecom licensing, why it matters for your business, and how having the right equipment – without supply chain delays- can make all the difference. Understanding Telecom Licensing In the UK, telecom licences are regulated by Ofcom, ensuring fair use of the radio spectrum and preventing interference between networks. Depending on your needs, you may require a specific licence for mobile services, fixed wireless access, or private networks. Securing the right licence is essential for operating legally and maintaining seamless connectivity. Why Licensing Affects Your Equipment Choices Having the correct licence is only one part of the equation – ensuring you have the right equipment is just as critical. Many businesses secure licences only to have delays due to supply chain shortages when sourcing essential telecom hardware. We Have Stock When Others Don’t While other suppliers struggle with stock shortages, we ensure that our customers have access to the telecom equipment they need, when they need it. Whether you’re setting up a private network, deploying 5G solutions, or upgrading infrastructure, we have a ready supply of:✔ Base stations and antennas✔ Network routers and switches✔ SIM cards and mobile connectivity solutions✔ Private network hardware By working with us, you can secure your telecom licence with confidence, knowing that supply chain issues won’t hold you back. Stay Ahead with Reliable Stock and Expert Support Navigating telecom licensing can be challenging, but having the right partner makes all the difference. At Rapid Wireless, we not only provide expert guidance on network deployment, but we also ensure you have immediate access to high-quality telecom equipment. Don’t let supply shortages slow you down. Get in touch with us today to discuss your licensing and hardware needs – we’re here to keep you connected.

Rapid Complete The Kennels Farm Tower Project

During the 2nd March visit to the proposed new site for the Barewell Hill tower, the site was viewed and discussed with Quickline personnel and agents. Specific to the site and Rapid’s requirements, access for plant and machinery was highlighted as a key factor. The design was reviewed towards the end of March with access indicated. Access requirements are indicated due to the change in ground height which rises in excess of 1mtr in short distance from the entrance set back from the curbside. The building of a hardcore and or tracked extended access was discussed to support the weight and climbing capabilities of both the cement truck and the lifting crane. The site plan does not reference the extension or building of the access track. Has this been included in the application? We also need to confirm that the plan design accommodates the size of the vehicles that would be included in the site preparation and build. There will need to be a sloped access track that starts at the road edge or further into the field entrance. If the track were to start at the road edge there would need to be a significant build-up of the ground to achieve the slope. If the slope were to be built within the entrance it would likely encroach on the compound. The gates indicated at the design appear to be at a point which would be on the access ramp and we don’t think there would be enough room to turn large vehicles within the compound. Concrete trucks are typically at least 8m long and would have to back up the slope. The trucks can climb quite steep slopes but the track surface would have to be really solid otherwise the trucks will rip it up. A typical crane of the size required is about 12m long so would almost fill half the compound. The crane needs to sit on level ground so the slope would need to be finished at approx. the position of the gates which would require a very steep slope from the road so we doubt that this would be viable. As an alternative solution to the access ramp, the close proximity of the curb-side offers the potential for concrete truck and crane to provide service at the curb-side. This would require traffic calming of one full lane of the two-lane Barewell Hill and a concrete pump would be required in addition to the concrete truck. There is a single line of trees separating the road from the build site (below). Accessing the build site with an excavator to complete ground preparation would not have the same constraints as the heavier plant and would require a less significant access ramp. Proposal illustrated as follows: If you have any tower requirements, then speak to us today and see how we can help you too!